BEFORE WE BEGIN
STARTING THE WORK
Digging out foundations for new walls
Foundations have been poured
Protecting access to rear
Upstairs ceiling removed
One of the posts was not even secured at ground level
Another post not installed correctly
Supporting post off level
Erecting the shoring
Starting demolition
Two posts totally unsupported
Top columns removed
Rotten balcony floor and supports
Part of the header removed
All gone !
Demolition complete
Looking straight up
Starting building the columns
Outer lintels in place
Building the side wall
View of the block-work
Fireplace wall built
Installing the flooring joists
Rebar in place ready for concrete pour
Upper column supports in place
Filling the columns and lintels with concrete
Removing the shoring
New balcony is now free-standing
Cut-outs for power screen channels
Balcony floor laid
Removing the pavers...
...and the steps
power-screen channels installed
Balcony deck dried-in
Building top headers
Pouring the steps, lanai floor and side entrance
Building cover for fire place
Constructing upstairs columns
Creating access panels for power-screens
Ready for stucco
Cables installed for TV location
Installing the stucco
Installing the ceiling and fans
Installing the tile