BEFORE WE BEGIN
THE WORK
Removing two layers of tile
Ceilings have been removed
Erecting the shoring
Demolishing the upstairs columns
Upstairs columns removed
Removing the balcony floor
View of the water-damaged headers
Looking straight up !
Removing the headers
The post base was not correctly attached
Demolition Finished
Starting to rebuild the columns
Concrete lintels installed
Rebar installed
Header rebuilt
Installing the balcony flooring
Flooding all the block with concrete
to make one solid structure
Removing the shoring
Installing the balcony floor
Drying-in the deck
Building-out the headers
Headers closed in and ready for stucco
Installing the tile backer
No comments:
Post a Comment