Covering up the pool
Taking down the ceilings
Constructing the roof supports
Holding up the roof
Uncovering the rotten balcony headers...
...caused the post to collapse
The other side
Water was trapped inside the balcony
Taking down the structure
Note the bend in the strap:
This indicates the balcony has dropped
The bottom of a removed post
Demolition under way
The end of a floor truss
Demolition finished
Starting to build the columns
Columns at full height
Concrete lintel installed
Floor joists going in
Flooding the lintel and columns with concrete
Two upstairs columns in place
All four columns installed
Shoring Remove -
The balcony is free-standing again
Balcony deck down
Framing the arches
Water-proofing the deck
Installing tile-backer
Ready for tiling
Stucco lath installed
Stucco scratch-coat applied
Final texture applied
Starting the ceiling install
Ceiling installed
Edge trim installed and primed
Painting the ceiling
Tiling the balcony floor
Grouting the tile
Gas line restored
Outdoor kitchen replaced
Upstairs posts painted and floor sealed
Installing the hand rails
Fans installed and working
FINAL VIEWS
for now
Applying primer and sealer
Applying the final paint coat
Installing the railings
Installing "Bubble-Pots" and Gutters
Final Views